Outcomes, argued from evidence.
How a defensible baseline, honest measurement on every data date and decisive action changed the result, across six representative engagements.

Filter by market
Every client is confidential. These engagements are representative and anonymised, so the lessons travel while identities stay protected.

Restoring a hyperscale campus to a defensible energization date
Four contractor schedules, one utility path and no shared critical path. An integrated master schedule and a weekly recovery cadence gave the owner command of the date again.
Case study
A refinery turnaround held to its restart window
Scope challenge, readiness gates and shift-by-shift control for a major turnaround with a fixed restart commitment.
Case study
Expanding an acute-care hospital while it stayed fully open
Owner's representation, live-campus phasing and clinical activation for a major expansion of an operating medical center.
Case study
Decision-grade controls for an advanced semiconductor fab
Integrated scheduling, quantity-based earned value and probabilistic forecasting across shell, cleanroom, utilities and tool install.
Case study
Modernizing a terminal without losing a departure
Phasing, cutover planning and contemporaneous delay analysis for a terminal modernization inside a busy, operating airport.
Case study
Resolving a contested delay on a treatment plant expansion
Forensic schedule analysis and claims support that moved a stalled dispute to an evidence-based settlement.
Case study
Command the date you announced.
Book a 45-minute program review with a senior principal. You will leave with an independent read of where your schedule and cost really stand, and the three moves that matter most.