CPM Scheduling
Critical Path Method schedules engineered so that every date has a reason, every float value means something and every forecast can be trusted in a boardroom.

A critical path you can manage by, and one you can defend.
CPM is the most powerful instrument in capital delivery and the most frequently misused. Open ends, constraint-driven dates and padded durations produce schedules that look finished and predict nothing. By the time the real critical path declares itself, the cheap options to protect the date have gone.
We build networks the way an engineer designs a load path. Every activity earns its place, every tie carries real logic and the critical path emerges from the work rather than being imposed on it. Each schedule is written to your contract specification and walked through with the people who will build it, so it is approved on first submission and used long after.
What we bring to CPM Scheduling
Senior practitioners, proven method and the right technology, specified line by line.
Network logic design
Complete predecessor and successor logic, the right relationship types, and every lag justified in writing.
INCLUDEDWBS & coding architecture
Breakdown structures, activity codes and calendars designed for the field and for executive reporting alike.
INCLUDEDDuration engineering
Durations derived from quantities, crew sizes and verified productivity for each trade and region.
INCLUDEDCalendar & constraint discipline
Calendars, weather allowances and constraints applied deliberately, never as a shortcut to a date.
INCLUDEDFloat stewardship
Total and free float analyzed, owned and reported, so contingency is visible rather than spent by default.
INCLUDEDSpecification compliance
Schedules prepared against your scheduling specification, line by line, to avoid rejection cycles that delay payment.
INCLUDEDA clear path, milestone by milestone.
Every engagement follows a disciplined sequence, so you always know what happens next and why.
What you receive
- RB-20101-D01Fully logic-linked CPM schedule (XER, XML or MPP)
- RB-20101-D02Basis of schedule memorandum and narrative
- RB-20101-D03Critical and near-critical path reports
- RB-20101-D04Activity coding structure and WBS dictionary
- RB-20101-D05Calendar and constraint register
- RB-20101-D06One-page executive summary schedule
Technology we work in
Platform-fluent and vendor-independent. We work inside your environment, or recommend the one that fits.
What changes when we arrive.
Not activity. Results your board, your lenders and your teams can feel.
A critical path that owners, lenders and contractors accept without argument.
Slippage visible months sooner, while there is still time and money to act.
Submittals accepted on first review, protecting the payment cycle.
What leaders ask us first.
Straight answers. If yours isn't logged here, raise it with us directly. A principal will respond.
How detailed should a CPM schedule be?
Detailed enough to manage the work and measure progress, and no more. We typically keep activity durations within one or two update periods, then calibrate to the phase and your contract's requirements.
Can you work in our existing platform?
Yes. We build natively in Primavera P6, Oracle Primavera Cloud and Microsoft Project, and convert between them without losing logic integrity.
Do you act for owners or contractors?
Both, but never both sides of one project. On any engagement we represent a single party, so our independence is never in question.
Baseline Schedule Development
Approved baselines that capture scope, sequence and risk with precision: the fixed reference against which every future decision, dollar and day is judged.
Integrated Master Scheduling (IMS)
Integrated Master Schedules that bind design, procurement, construction and commissioning into one traceable program view, from board summary to field activity.
Bid & Tender Schedules
Compliant, persuasive tender schedules that demonstrate mastery of the work, produced at the speed bid deadlines demand.

Command the date you announced.
Book a 45-minute program review with a senior principal. You will leave with an independent read of where your schedule and cost really stand, and the three moves that matter most.


