RichardBarkleyProject Controls & Capital Advisory
2.0 — WHAT WE DO

6 practices.
49 services.

All practices & services →
2.03 · 7 services

Owner's Advisory & Assurance

Independent senior counsel for owners, boards and investors, from investment decision through recovery and handover.

Open
2.05 · 5 services

Controls Intelligence

Power BI, executive analytics and forecasting that give capital leaders decision-grade foresight.

Open
2.06 · 6 services

The Barkley Institute

Practitioner-taught courses and executive education in P6, scheduling, controls and delay analysis.

Open
Featured practice

Command of the critical path.

1.0 — WHO WE ARE

Independent. Senior. Decisive.

The controls partner owners call when the date cannot move.

Overview
3.0 — MARKETS

Sector fluency. One standard.

We know where each sector hides its schedule risk.

Overview
4.0 — PROJECTS

Representative work. Every client confidential.

60 featured projects across 17 sectors. Every client confidential.

Overview
7.0 — INSIGHTS

Decision-grade thinking.

Field notes, papers and briefings for the people who fund and build.

Overview
9.0 — CAREERS

Do the most consequential work of your career.

For planners, cost engineers and analysts who want their judgment to matter.

Overview
Practice 2.01 · Planning & SchedulingREF 2.01.14

Shutdown & Turnaround Scheduling

Hour-by-hour shutdown and turnaround schedules that compress outage windows and return critical assets to service safely, on the date operations committed to.

FIG. 01 — Shutdown & Turnaround Scheduling
Practice2.01 Planning & Scheduling
Service14 of 15
Capabilities6
Deliverables6
Data date
StatusAvailable now
Scope statement

When every hour offline costs production, every hour is planned.

A shutdown is a race against a clock measured in lost production. Thousands of tasks, hundreds of workers and dozens of contractors converge on one asset for days or weeks, and a single missed sequence can extend the outage and multiply its cost.

We plan at the resolution these events demand: hour by hour and shift by shift, with scope challenge, isolation sequences, permits, scaffolding, cranes and inspection holds woven into one integrated plan. During execution we update around the clock, so supervisors always know what is next, what is at risk and what the restart date really is.

SH-02 · Capability schedule

What we bring to Shutdown & Turnaround Scheduling

Senior practitioners, proven method and the right technology, specified line by line.

C-01

Scope challenge & freeze

Every work order tested for necessity and readiness, then frozen to protect the window.

INCLUDED
C-02

Hourly scheduling

Shift-level schedules with crews, equipment and permits assigned.

INCLUDED
C-03

Isolation sequencing

Lock-out, tag-out, isolation and de-isolation logic built into the plan.

INCLUDED
C-04

Window compression

Parallel paths, prefabrication and added crews used to shorten the outage.

INCLUDED
C-05

Execution command

Shift-by-shift updates, emergent-work control and recovery planning during the event.

INCLUDED
C-06

Post-event critique

Performance analysis that makes the next outage shorter.

INCLUDED
SH-03 · Approach

A clear path, milestone by milestone.

Every engagement follows a disciplined sequence, so you always know what happens next and why.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Challenge

We test and freeze the work list with operations and maintenance.

PHASE 02Integrate

We build one hour-by-hour plan with every contractor.

PHASE 03Command

We control execution in real time, day and night.

PHASE 04Critique

We review performance and lock in improvements for the next cycle.

SH-04 · Transmittal

What you receive

  • RB-20114-D01Challenged and frozen scope
  • RB-20114-D02Hour-by-hour integrated schedule
  • RB-20114-D03Isolation and permit sequence
  • RB-20114-D04Shift reports and live dashboards
  • RB-20114-D05Execution recovery plans
  • RB-20114-D06Post-event performance critique
Platforms

Technology we work in

Platform-fluent and vendor-independent. We work inside your environment, or recommend the one that fits.

SH-05 · Outcomes

What changes when we arrive.

Not activity. Results your board, your lenders and your teams can feel.

Outcome 01Shorter outages

Assets back in production sooner.

Outcome 02Safer execution

Isolation and permit logic designed into the plan, not added later.

Outcome 03Predictable restarts

Return-to-service dates leadership can rely on.

RFI log · questions answered

What leaders ask us first.

Straight answers. If yours isn't logged here, raise it with us directly. A principal will respond.

How far ahead should planning start?

Months ahead for major shutdowns, and a year or more for large turnarounds. Scope development, long-lead materials and contractor mobilization all need time.

How do you handle emergent work?

Through a controlled process that assesses each item's effect on the critical path before it is accepted into the plan.

Which sectors do you support?

Oil and gas, chemicals, power generation, life sciences, manufacturing and mission-critical facilities.

The next step

Command the date you announced.

Book a 45-minute program review with a senior principal. You will leave with an independent read of where your schedule and cost really stand, and the three moves that matter most.