Cost & Project Controls
Integrated controls that tell owners and builders where the money and the dates really stand, early enough to change the answer.

Command of cost, period after period.
On most troubled programs the information existed. It sat in a change log nobody priced, a commitment nobody recorded and a progress figure nobody verified. By the time it reached the steering committee, the cheap options had closed and the board was being asked to approve a number it had never seen coming.
RichardBarkley designs, staffs and runs controls functions for owners, program managers and contractors. We bind schedule, cost, change, risk and progress into one system, close it out at every data date and translate it into decision-grade reporting. Every figure traces to evidence. Every forecast carries its basis and its confidence. Every variance has a name beside it.
The cost of a late signal is always the largest line
Programs rarely fail for lack of data. They fail because the truth reached the decision-makers a quarter too late to be cheap.
One system
Schedule, cost, change and risk reconciled at the same data date, never four reports that disagree.
Evidence
Progress earned from physical work and verified in the field, so the numbers survive scrutiny.
Foresight
Cost-to-complete and finish dates forecast as ranges, with the drivers made explicit.
Ownership
A named owner for every variance, every change and every corrective action.
9 ways we put cost and time under command
Engage a single service, or the whole practice as an integrated team. Every line is led by a senior practitioner.
Controls leadership
3 servicesSchedule, cost, change, risk and reporting designed, staffed and led by RichardBarkley, running to a disciplined monthly cycle from the first period.
2.02.02Program ControlsProgram-level controls that bind multiple projects, contractors and funding sources into a single picture sponsors can steer by.
2.02.03PMO ServicesDesign, launch and operation of project management offices that raise delivery performance and give leadership a portfolio it can steer.
Cost & performance
3 servicesBudget structure, commitment tracking and cost-to-complete forecasting that protect contingency and keep the final cost the one you approved.
2.02.05Earned Value Management (EVM)Earned value systems that integrate scope, schedule and budget, measure performance without opinion and forecast completion from evidence.
2.02.06Progress MeasurementQuantity-based, field-verified progress measurement that turns physical work into numbers owners, lenders and auditors will accept.
Change, forecast & reporting
3 servicesChange control that captures, prices, schedules and records every change to scope, time and cost before it erodes contingency or entitlement.
2.02.08ForecastingRisk-informed schedule and cost forecasts, expressed as P50 and P80 ranges, that give executives an honest view of the finish date and final cost.
2.02.09Executive ReportingConcise, candid, decision-grade reporting for boards, executives, lenders and public stakeholders.
Controls are not a tax on delivery. They are what lets a program move quickly with the board still behind it.The Barkley standard
Markets this practice serves
3.01Data Centers
Hyperscale, colocation and AI campuses, where a slipped energization date is capacity a customer has already contracted for.
3.09Semiconductor
Fabs, cleanrooms and advanced packaging facilities, among the most complex and capital-intensive buildings attempted anywhere.
3.04Industrial
Process plants, heavy industry and infrastructure-scale facilities, where engineering, procurement and construction overlap by design.
3.11Transportation
Highways, bridges, transit and rail programs funded by the public and watched by it.
3.16Government
Federal, state and municipal programs that demand transparency, compliance and accountability for every dollar.
3.14Power
Generation, transmission, renewables and storage, where commercial operation dates are written into offtake and financing.
3.06Distribution Centers
Fulfillment centers, logistics hubs and cold storage, delivered in compressed, repeatable programs across regions.
3.15Oil & Gas
Upstream, midstream and downstream projects, turnarounds and brownfield work in demanding environments.
Owner's Advisory & Assurance
Independent senior counsel for owners, boards and investors, from investment decision through recovery and handover.
Forensic Delay & Claims
Delay analysis, entitlement and expert opinion built to be tested, and to hold.
Controls Intelligence
Power BI, executive analytics and forecasting that give capital leaders decision-grade foresight.

Command the date you announced.
Book a 45-minute program review with a senior principal. You will leave with an independent read of where your schedule and cost really stand, and the three moves that matter most.