RichardBarkleyProject Controls & Capital Advisory
2.0 — WHAT WE DO

6 practices.
49 services.

All practices & services →
2.03 · 7 services

Owner's Advisory & Assurance

Independent senior counsel for owners, boards and investors, from investment decision through recovery and handover.

Open
2.05 · 5 services

Controls Intelligence

Power BI, executive analytics and forecasting that give capital leaders decision-grade foresight.

Open
2.06 · 6 services

The Barkley Institute

Practitioner-taught courses and executive education in P6, scheduling, controls and delay analysis.

Open
Featured practice

Command of the critical path.

1.0 — WHO WE ARE

Independent. Senior. Decisive.

The controls partner owners call when the date cannot move.

Overview
3.0 — MARKETS

Sector fluency. One standard.

We know where each sector hides its schedule risk.

Overview
4.0 — PROJECTS

Representative work. Every client confidential.

60 featured projects across 17 sectors. Every client confidential.

Overview
7.0 — INSIGHTS

Decision-grade thinking.

Field notes, papers and briefings for the people who fund and build.

Overview
9.0 — CAREERS

Do the most consequential work of your career.

For planners, cost engineers and analysts who want their judgment to matter.

Overview
Practice 2.01 · Planning & SchedulingREF 2.01.03

Integrated Master Scheduling (IMS)

Integrated Master Schedules that bind design, procurement, construction and commissioning into one traceable program view, from board summary to field activity.

FIG. 01 — Integrated Master Scheduling (IMS)
Practice2.01 Planning & Scheduling
Service03 of 15
Capabilities6
Deliverables6
Data date
StatusAvailable now
Scope statement

Many contractors, many schedules. One defensible forecast.

Large programs rarely fail inside a single contract. They fail at the seams: designer to builder, procurement to field, one package to the next. Each party's schedule can report green while the program as a whole quietly drifts, and the executive team discovers it only when two healthy schedules collide.

An Integrated Master Schedule closes those seams. We connect every contributing schedule through controlled interface milestones and vertical traceability, so the summary your board sees is mathematically tied to the work that drives it. A delay anywhere becomes visible everywhere it matters, at the next data date rather than the next crisis.

SH-02 · Capability schedule

What we bring to Integrated Master Scheduling (IMS)

Senior practitioners, proven method and the right technology, specified line by line.

C-01

Program architecture

Master, intermediate and detailed schedules linked with clear vertical traceability.

INCLUDED
C-02

Interface control

Hand-off milestones between contractors, designers and suppliers defined, owned and tracked each period.

INCLUDED
C-03

EVMS alignment

Structures that support ANSI/EIA-748 earned value requirements where they apply.

INCLUDED
C-04

Multi-contractor integration

Contractor submissions ingested, validated and integrated every period without manual re-keying.

INCLUDED
C-05

Program risk analysis

Monte Carlo analysis at program level, expressing key dates as P50 and P80 confidence.

INCLUDED
C-06

IMS narratives

Plain-language period narratives on movement, driving paths and corrective action.

INCLUDED
SH-03 · Approach

A clear path, milestone by milestone.

Every engagement follows a disciplined sequence, so you always know what happens next and why.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Frame

We define the program hierarchy, integration rules and interface points.

PHASE 02Connect

We assemble the contributing schedules with controlled linkages.

PHASE 03Verify

We test traceability, logic integrity and driving paths across the whole program.

PHASE 04Command

We run the monthly integration cycle and report the program's true position.

SH-04 · Transmittal

What you receive

  • RB-20103-D01Integrated Master Schedule and program plan
  • RB-20103-D02IMS data dictionary and integration rules
  • RB-20103-D03Interface milestone register
  • RB-20103-D04Program-level critical path reports
  • RB-20103-D05Schedule risk assessment with P50/P80 dates
  • RB-20103-D06Monthly IMS narrative and dashboards
Platforms

Technology we work in

Platform-fluent and vendor-independent. We work inside your environment, or recommend the one that fits.

SH-05 · Outcomes

What changes when we arrive.

Not activity. Results your board, your lenders and your teams can feel.

Outcome 01Program-wide sightlines

Every party's effect on the end date visible in a single view.

Outcome 02Quieter seams

Interface risks surfaced early, before they mature into claims.

Outcome 03One number for the board

A single defensible forecast in place of a dozen competing ones.

RFI log · questions answered

What leaders ask us first.

Straight answers. If yours isn't logged here, raise it with us directly. A principal will respond.

How is an IMS different from a master schedule?

A master schedule is usually a summary plan. An IMS is logically connected and vertically traceable from summary milestones down to detailed activities across every contributor.

Do you support federal and defense IMS requirements?

Yes. We structure schedules in line with ANSI/EIA-748 principles and the IMS expectations common on public and defense programs.

What if contractors use different software?

We set data standards and formats at the outset, then convert and validate each submission so the integrated model stays clean.

The next step

Command the date you announced.

Book a 45-minute program review with a senior principal. You will leave with an independent read of where your schedule and cost really stand, and the three moves that matter most.