Semiconductor Fab Support Buildings
Ultrapure water, gases and power. If the support buildings slip, billions of dollars of tools wait.
LocationPhoenix, AZIn advanced technology and life sciences, the building is an instrument. Utilities, cleanrooms and validation must be right the first time, because the equipment and products that follow are worth far more than the structure.
A chipmaker is building the central utility and support buildings that serve its new fabrication plant.
Tool installation in the fab depends on utilities being commissioned in a strict order. A slip here does not stay here: it stalls equipment worth many times the cost of the buildings themselves.
The whole program, on one line.
Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.
Our approach, phase by phase.
The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

The difference we made
Measured the only way that matters: whether the date and the budget held.
Utility commissioning is sequenced to hand over before each tool install area opens.
Contractor-to-contractor interfaces sit in the master schedule as dated, owned milestones.
Look-ahead plans coordinate thousands of daily workers in constrained spaces.
What we brought to it
Integrated Master Schedules that bind design, procurement, construction and commissioning into one traceable program view, from board summary to field activity.
2.01.13Look Ahead PlanningRolling look-ahead plans that translate the master schedule into ready, resourced, constraint-free work at the workface, where productivity is won or lost.
2.01.15Commissioning & Startup SchedulingSystem-based commissioning and startup schedules that carry facilities from mechanical completion to reliable operation without the familiar last-mile slip.
2.02.01Project Controls ManagementSchedule, cost, change, risk and reporting designed, staffed and led by RichardBarkley, running to a disciplined monthly cycle from the first period.
More Semiconductor projects
SemiconductorCompleted 2024Advanced Packaging Cleanroom Expansion
- Value
- $310M
- Size
- 120,000 sq ft cleanroom
- Client
- Confidential
HealthcareCompleted 2024Comprehensive Cancer Center & Proton Therapy
- Value
- $410M
- Size
- 260,000 sq ft
- Client
- Confidential
HospitalityCompleted 2024Luxury Resort Modernization
- Value
- $210M
- Size
- 500 keys
- Client
- Confidential

Make your program the next one we land.
Tell us what you are building and the date your board expects. In one senior-led review you will know what it will take to hold it.