Advanced Packaging Cleanroom Expansion
A new cleanroom beside a live production floor, where improvisation was never an option.
LocationTaylor, TXIn advanced technology and life sciences, the building is an instrument. Utilities, cleanrooms and validation must be right the first time, because the equipment and products that follow are worth far more than the structure.
A semiconductor company expanded its advanced packaging cleanroom alongside operating production.
Cleanliness protocols, vibration limits and live-plant tie-ins left no margin for decisions made on the fly. Every activity near production needed its sequence, duration and controls agreed in advance.
The whole program, on one line.
Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.
Our approach, phase by phase.
The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

The difference we made
Measured the only way that matters: whether the date and the budget held.
The cleanroom met its ISO classification at first certification.
Construction did not interrupt live production at any point.
Tool move-in began on the date the owner had planned.
What we brought to it
Critical Path Method schedules engineered so that every date has a reason, every float value means something and every forecast can be trusted in a boardroom.
2.01.14Shutdown & Turnaround SchedulingHour-by-hour shutdown and turnaround schedules that compress outage windows and return critical assets to service safely, on the date operations committed to.
2.01.15Commissioning & Startup SchedulingSystem-based commissioning and startup schedules that carry facilities from mechanical completion to reliable operation without the familiar last-mile slip.
2.01.06Schedule UpdatesDisciplined periodic updates that capture verified progress, explain every movement and keep the schedule an instrument of command rather than a record of hope.
More Semiconductor projects
SemiconductorIn progress · 2026Semiconductor Fab Support Buildings
- Value
- $720M
- Size
- Central utility & support
- Client
- Confidential
HealthcareIn progress · 2027Academic Medical Center Patient Tower
- Value
- $1.15B
- Size
- 820,000 sq ft · 14 stories
- Client
- Confidential
HealthcareCompleted 2025Children's Hospital Pediatric Pavilion
- Value
- $640M
- Size
- 410,000 sq ft
- Client
- Confidential

Make your program the next one we land.
Tell us what you are building and the date your board expects. In one senior-led review you will know what it will take to hold it.