RichardBarkleyProject Controls & Capital Advisory
2.0 — WHAT WE DO

6 practices.
49 services.

All practices & services →
2.03 · 7 services

Owner's Advisory & Assurance

Independent senior counsel for owners, boards and investors, from investment decision through recovery and handover.

Open
2.05 · 5 services

Controls Intelligence

Power BI, executive analytics and forecasting that give capital leaders decision-grade foresight.

Open
2.06 · 6 services

The Barkley Institute

Practitioner-taught courses and executive education in P6, scheduling, controls and delay analysis.

Open
Featured practice

Command of the critical path.

1.0 — WHO WE ARE

Independent. Senior. Decisive.

The controls partner owners call when the date cannot move.

Overview
3.0 — MARKETS

Sector fluency. One standard.

We know where each sector hides its schedule risk.

Overview
4.0 — PROJECTS

Representative work. Every client confidential.

60 featured projects across 17 sectors. Every client confidential.

Overview
7.0 — INSIGHTS

Decision-grade thinking.

Field notes, papers and briefings for the people who fund and build.

Overview
9.0 — CAREERS

Do the most consequential work of your career.

For planners, cost engineers and analysts who want their judgment to matter.

Overview
Healthcare · ModernizationCompleted 2024

Regional Hospital OR & HVAC Modernization

Twelve operating rooms to modernize, and one rule from the surgeons: never more than one closed at a time.

LocationAthens, GA
ClientConfidential
LocationAthens, GA
SectorHealthcare
Value$57M
Size12 operating rooms
DeliveryCM at Risk
Duration20 months
StatusCompleted 2024
Why it mattered

Building inside a working hospital means every hour of construction is taken from patient care. The discipline is to take as little as possible, give it back on the hour agreed, and treat infection control as logic, not paperwork.

The challenge

A regional referral hospital needed to renew twelve operating rooms and the air handlers behind them. Leadership set a single condition: surgical capacity could drop by no more than one room at any point.

The trap was mechanical. Several air handlers served multiple rooms, so a poorly sequenced cutover could take three rooms down at once. The schedule had to marry air-side phasing to room turnovers before a single trade mobilized.

Schedule at a glance

The whole program, on one line.

Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.

StartNov 2022
Duration20 months
HandoverJul 2024
Progress—
Capture the constraintsScript every outagePublish the look-aheadReturn rooms on time
How we held the date

Our approach, phase by phase.

The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Capture the constraints

Surgical calendars, ICRA classes, utility dependencies and clinical sign-offs written into the schedule as hard logic.

PHASE 02Script every outage

Each shutdown and room turnover planned hour by hour and walked through with facilities and clinical leadership beforehand.

PHASE 03Publish the look-ahead

A rolling two-week view issued to clinicians in plain language, so no department was ever caught unaware.

PHASE 04Return rooms on time

Commissioning, air balancing, testing and terminal cleaning sequenced so each space went back to care on its scheduled hour.

What changed

The difference we made

Measured the only way that matters: whether the date and the budget held.

Result 01One room at a time, for twenty months

At no point in the program was more than one room out of service.

Result 02Air side and room side aligned

Air-handler cutovers were scheduled inside room turnovers, so no room left service twice.

Result 03Surgeons kept ahead

A plain-language two-week view of room availability reached every surgeon each Friday.