Twelve operating rooms to modernize, and one rule from the surgeons: never more than one closed at a time.
LocationAthens, GABuilding inside a working hospital means every hour of construction is taken from patient care. The discipline is to take as little as possible, give it back on the hour agreed, and treat infection control as logic, not paperwork.
A regional referral hospital needed to renew twelve operating rooms and the air handlers behind them. Leadership set a single condition: surgical capacity could drop by no more than one room at any point.
The trap was mechanical. Several air handlers served multiple rooms, so a poorly sequenced cutover could take three rooms down at once. The schedule had to marry air-side phasing to room turnovers before a single trade mobilized.
The whole program, on one line.
Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.
Our approach, phase by phase.
The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

The difference we made
Measured the only way that matters: whether the date and the budget held.
At no point in the program was more than one room out of service.
Air-handler cutovers were scheduled inside room turnovers, so no room left service twice.
A plain-language two-week view of room availability reached every surgeon each Friday.
What we brought to it
Rolling look-ahead plans that translate the master schedule into ready, resourced, constraint-free work at the workface, where productivity is won or lost.
2.01.01CPM SchedulingCritical Path Method schedules engineered so that every date has a reason, every float value means something and every forecast can be trusted in a boardroom.
2.01.06Schedule UpdatesDisciplined periodic updates that capture verified progress, explain every movement and keep the schedule an instrument of command rather than a record of hope.
2.02.09Executive ReportingConcise, candid, decision-grade reporting for boards, executives, lenders and public stakeholders.
More Healthcare projects
HealthcareCompleted 2024Ambulatory HealthPlace Campus
- Value
- $185M
- Size
- 160,000 sq ft
- Client
- Confidential
HealthcareCompleted 2023Cardiothoracic Robotic Operating Suites
- Value
- $64M
- Size
- 38,000 sq ft
- Client
- Confidential
HealthcareCompleted 2023Multi-Site Specialty Pharmacy Program
- Value
- $48M
- Size
- 14 sites
- Client
- Confidential

Make your program the next one we land.
Tell us what you are building and the date your board expects. In one senior-led review you will know what it will take to hold it.