RichardBarkleyProject Controls & Capital Advisory
2.0 — WHAT WE DO

6 practices.
49 services.

All practices & services →
2.03 · 7 services

Owner's Advisory & Assurance

Independent senior counsel for owners, boards and investors, from investment decision through recovery and handover.

Open
2.05 · 5 services

Controls Intelligence

Power BI, executive analytics and forecasting that give capital leaders decision-grade foresight.

Open
2.06 · 6 services

The Barkley Institute

Practitioner-taught courses and executive education in P6, scheduling, controls and delay analysis.

Open
Featured practice

Command of the critical path.

1.0 — WHO WE ARE

Independent. Senior. Decisive.

The controls partner owners call when the date cannot move.

Overview
3.0 — MARKETS

Sector fluency. One standard.

We know where each sector hides its schedule risk.

Overview
4.0 — PROJECTS

Representative work. Every client confidential.

60 featured projects across 17 sectors. Every client confidential.

Overview
7.0 — INSIGHTS

Decision-grade thinking.

Field notes, papers and briefings for the people who fund and build.

Overview
9.0 — CAREERS

Do the most consequential work of your career.

For planners, cost engineers and analysts who want their judgment to matter.

Overview
Healthcare · New ConstructionCompleted 2024

Ambulatory HealthPlace Campus

The opening date was in the local paper before the schedule could defend it. We made it defensible.

LocationPonte Vedra, FL
ClientConfidential
LocationPonte Vedra, FL
SectorHealthcare
Value$185M
Size160,000 sq ft
DeliveryCM at Risk
Duration26 months
StatusCompleted 2024
Why it mattered

A late hospital opening is measured in patients, not penalties: a family driving further for care, a surgeon without a room, a community told to wait. Boards need a date they can announce and defend, and we build the schedule that earns it.

The challenge

Residents of a fast-growing coastal community were driving forty minutes for specialty care. The owner had publicly committed to an ambulatory campus with imaging, surgery, urgent care and physician offices, and the date was already public.

Our first assessment found design still moving as early packages went to bid, and more than two hundred long-lead medical equipment items with no logic tying them to room readiness. On paper the schedule carried healthy float. In practice, roughly ten weeks of it depended on equipment nobody had sequenced.

Schedule at a glance

The whole program, on one line.

Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.

StartMay 2022
Duration26 months
HandoverJul 2024
Progress—
Assess every scheduleArchitect by roomCommand each periodClose into activation
How we held the date

Our approach, phase by phase.

The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Assess every schedule

An independent health check of each schedule in play, then a single integrated critical path linking design, procurement, construction and medical equipment.

PHASE 02Architect by room

Equipment, IT and life-safety systems tied to the readiness of individual rooms and departments, not whole floors.

PHASE 03Command each period

Two-week data dates, earned value and quantified P50/P80 risk, so leadership could act months ahead rather than weeks.

PHASE 04Close into activation

Commissioning, inspections, clinical training and move-in sequenced as one critical chain to the first patient.

What changed

The difference we made

Measured the only way that matters: whether the date and the budget held.

Result 01Opened on the announced date

Every department saw its first patient on the day the community had been told, with no phased fallback needed.

Result 02A hidden exposure made visible

Each long-lead item was linked to the room it served, turning a ten-week blind spot into a managed sequence.

Result 03One decision-grade schedule

Owner, architect and contractor ran the job from a single integrated schedule, refreshed at every two-week data date.

Your program, under command

Make your program the next one we land.

Tell us what you are building and the date your board expects. In one senior-led review you will know what it will take to hold it.