Hospital Central Laundry Expansion
Every clean sheet on a major medical campus passes through this plant. It nearly doubled in capacity without a lost shift.
LocationJacksonville, FLIn a working plant, the most expensive thing on site is downtime. The schedule's job is to let construction happen without production ever feeling it.
A large medical campus needed to nearly double its central laundry capacity to keep pace with new beds and operating rooms. The plant ran around the clock, every day of the year.
Tunnel washers, dryers and conveyors had to be installed and commissioned beside live production. Every hour of downtime was bought back through third-party processing, at a premium the owner could read on each invoice.
The whole program, on one line.
Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.
Our approach, phase by phase.
The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

The difference we made
Measured the only way that matters: whether the date and the budget held.
Tie-ins landed in scripted weekend windows, each with a tested fallback if a cutover ran long.
Fabrication and delivery were tracked as schedule activities, so a late shipment registered as float consumed rather than as a surprise on site.
The new line reached full throughput before the next patient tower opened its doors.
What we brought to it
Critical Path Method schedules engineered so that every date has a reason, every float value means something and every forecast can be trusted in a boardroom.
2.01.14Shutdown & Turnaround SchedulingHour-by-hour shutdown and turnaround schedules that compress outage windows and return critical assets to service safely, on the date operations committed to.
2.01.15Commissioning & Startup SchedulingSystem-based commissioning and startup schedules that carry facilities from mechanical completion to reliable operation without the familiar last-mile slip.
2.02.06Progress MeasurementQuantity-based, field-verified progress measurement that turns physical work into numbers owners, lenders and auditors will accept.
More Healthcare projects
HealthcareCompleted 2024Ambulatory HealthPlace Campus
- Value
- $185M
- Size
- 160,000 sq ft
- Client
- Confidential
HealthcareCompleted 2023Cardiothoracic Robotic Operating Suites
- Value
- $64M
- Size
- 38,000 sq ft
- Client
- Confidential
HealthcareCompleted 2023Multi-Site Specialty Pharmacy Program
- Value
- $48M
- Size
- 14 sites
- Client
- Confidential

Make your program the next one we land.
Tell us what you are building and the date your board expects. In one senior-led review you will know what it will take to hold it.