EV Battery Cell Manufacturing Plant
Thousands of workers a day on one site. The schedule has to tell each crew where to be.
LocationKentuckyNew manufacturing capacity has customers waiting on it before the slab is poured. The first production run is the date that matters, and everything else is a means to it.
A battery joint venture is building a gigafactory to supply electric vehicle production. Dry rooms, process tools and utilities make it as complex as many semiconductor fabs.
At peak, several thousand craft workers will be on site daily. Without disciplined coding and trade sequencing, access, laydown and stacking problems would show up as lost productivity long before they showed up as late activities.
The whole program, on one line.
Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.
Our approach, phase by phase.
The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

The difference we made
Measured the only way that matters: whether the date and the budget held.
More than 40,000 activities are managed in a structured, coded master schedule.
Resource-loaded craft curves inform recruitment, housing and site logistics months ahead of need.
Earned value and quantity-based progress have replaced subjective percent-complete.
What we brought to it
Integrated Master Schedules that bind design, procurement, construction and commissioning into one traceable program view, from board summary to field activity.
2.01.10Resource LoadingLabor, equipment and cost loading that turns a schedule into a feasible plan for people, plant and cash, and the foundation for earned value.
2.02.05Earned Value Management (EVM)Earned value systems that integrate scope, schedule and budget, measure performance without opinion and forecast completion from evidence.
2.02.01Project Controls ManagementSchedule, cost, change, risk and reporting designed, staffed and led by RichardBarkley, running to a disciplined monthly cycle from the first period.
2.05.05Executive ScorecardsConcise executive scorecards that tie strategic objectives to delivery, cost, safety and risk measures, with clear owners and thresholds.
More Manufacturing projects
ManufacturingCompleted 2024Advanced Manufacturing Campus
- Value
- $390M
- Size
- 1,000,000 sq ft
- Client
- Confidential
ManufacturingCompleted 2022Aerospace Components Facility
- Value
- $160M
- Size
- 340,000 sq ft
- Client
- Confidential
HealthcareCompleted 2024Ambulatory HealthPlace Campus
- Value
- $185M
- Size
- 160,000 sq ft
- Client
- Confidential

Make your program the next one we land.
Tell us what you are building and the date your board expects. In one senior-led review you will know what it will take to hold it.