RichardBarkleyProject Controls & Capital Advisory
2.0 — WHAT WE DO

6 practices.
49 services.

All practices & services →
2.03 · 7 services

Owner's Advisory & Assurance

Independent senior counsel for owners, boards and investors, from investment decision through recovery and handover.

Open
2.05 · 5 services

Controls Intelligence

Power BI, executive analytics and forecasting that give capital leaders decision-grade foresight.

Open
2.06 · 6 services

The Barkley Institute

Practitioner-taught courses and executive education in P6, scheduling, controls and delay analysis.

Open
Featured practice

Command of the critical path.

1.0 — WHO WE ARE

Independent. Senior. Decisive.

The controls partner owners call when the date cannot move.

Overview
3.0 — MARKETS

Sector fluency. One standard.

We know where each sector hides its schedule risk.

Overview
4.0 — PROJECTS

Representative work. Every client confidential.

60 featured projects across 17 sectors. Every client confidential.

Overview
7.0 — INSIGHTS

Decision-grade thinking.

Field notes, papers and briefings for the people who fund and build.

Overview
9.0 — CAREERS

Do the most consequential work of your career.

For planners, cost engineers and analysts who want their judgment to matter.

Overview
Manufacturing · New ConstructionCompleted 2024

Advanced Manufacturing Campus

Customers had planned around the first production run. A million square feet had to be ready for it.

LocationAurora, CO
ClientConfidential
LocationAurora, CO
SectorManufacturing
Value$390M
Size1,000,000 sq ft
DeliveryDesign-Build
Duration30 months
StatusCompleted 2024
Why it mattered

New manufacturing capacity has customers waiting on it before the slab is poured. The first production run is the date that matters, and everything else is a means to it.

The challenge

A manufacturer built a million-square-foot campus to bring production of advanced components onshore.

Reaching the first production date meant overlapping tool installation, utilities and building completion far more than a conventional sequence allows. That overlap was where the real schedule risk lived.

Schedule at a glance

The whole program, on one line.

Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.

StartJan 2022
Duration30 months
HandoverJul 2024
Progress—
Overlap with controlTrack outside dependenciesMeasure, do not estimatePlan the first run
How we held the date

Our approach, phase by phase.

The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Overlap with control

Phased building turnover planned so tool installation could start well before the building was complete.

PHASE 02Track outside dependencies

Utility service, permits and equipment deliveries held as critical external milestones.

PHASE 03Measure, do not estimate

Earned value and quantity-based progress in place of opinion-based percent complete.

PHASE 04Plan the first run

Commissioning and production ramp-up scheduled with operations from the first baseline.

What changed

The difference we made

Measured the only way that matters: whether the date and the budget held.

Result 01Tools in months earlier

Phased building turnover let tool installation start well before substantial completion.

Result 02Utilities tracked as critical

Power and gas service dates were held as external milestones with named owners and weekly status.

Result 03First run on schedule

Production began on the date given to customers.