Advanced Manufacturing Campus
Customers had planned around the first production run. A million square feet had to be ready for it.
LocationAurora, CONew manufacturing capacity has customers waiting on it before the slab is poured. The first production run is the date that matters, and everything else is a means to it.
A manufacturer built a million-square-foot campus to bring production of advanced components onshore.
Reaching the first production date meant overlapping tool installation, utilities and building completion far more than a conventional sequence allows. That overlap was where the real schedule risk lived.
The whole program, on one line.
Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.
Our approach, phase by phase.
The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

The difference we made
Measured the only way that matters: whether the date and the budget held.
Phased building turnover let tool installation start well before substantial completion.
Power and gas service dates were held as external milestones with named owners and weekly status.
Production began on the date given to customers.
What we brought to it
Integrated Master Schedules that bind design, procurement, construction and commissioning into one traceable program view, from board summary to field activity.
2.01.10Resource LoadingLabor, equipment and cost loading that turns a schedule into a feasible plan for people, plant and cash, and the foundation for earned value.
2.02.05Earned Value Management (EVM)Earned value systems that integrate scope, schedule and budget, measure performance without opinion and forecast completion from evidence.
2.01.15Commissioning & Startup SchedulingSystem-based commissioning and startup schedules that carry facilities from mechanical completion to reliable operation without the familiar last-mile slip.
More Manufacturing projects
ManufacturingIn progress · 2027EV Battery Cell Manufacturing Plant
- Value
- $1.85B
- Size
- 3,000,000 sq ft
- Client
- Confidential
ManufacturingCompleted 2022Aerospace Components Facility
- Value
- $160M
- Size
- 340,000 sq ft
- Client
- Confidential
Food & BeverageCompleted 2024Food Manufacturing ASRS Building Addition
- Value
- $96M
- Size
- 120 ft high-bay ASRS
- Client
- Confidential

Make your program the next one we land.
Tell us what you are building and the date your board expects. In one senior-led review you will know what it will take to hold it.