RichardBarkleyProject Controls & Capital Advisory
2.0 — WHAT WE DO

6 practices.
49 services.

All practices & services →
2.03 · 7 services

Owner's Advisory & Assurance

Independent senior counsel for owners, boards and investors, from investment decision through recovery and handover.

Open
2.05 · 5 services

Controls Intelligence

Power BI, executive analytics and forecasting that give capital leaders decision-grade foresight.

Open
2.06 · 6 services

The Barkley Institute

Practitioner-taught courses and executive education in P6, scheduling, controls and delay analysis.

Open
Featured practice

Command of the critical path.

1.0 — WHO WE ARE

Independent. Senior. Decisive.

The controls partner owners call when the date cannot move.

Overview
3.0 — MARKETS

Sector fluency. One standard.

We know where each sector hides its schedule risk.

Overview
4.0 — PROJECTS

Representative work. Every client confidential.

60 featured projects across 17 sectors. Every client confidential.

Overview
7.0 — INSIGHTS

Decision-grade thinking.

Field notes, papers and briefings for the people who fund and build.

Overview
9.0 — CAREERS

Do the most consequential work of your career.

For planners, cost engineers and analysts who want their judgment to matter.

Overview
Life Sciences · New ConstructionIn progress · 2026

Pharmaceutical Fill-Finish Facility

Patients are waiting on medicines this plant will make. Validation has to finish on time.

LocationResearch Triangle, NC
ClientConfidential
LocationResearch Triangle, NC
SectorLife Sciences
Value$690M
Size400,000 sq ft
DeliveryEPCM
Duration36 months
StatusTarget 2026
Why it mattered

In advanced technology and life sciences, the building is an instrument. Utilities, cleanrooms and validation must be right the first time, because the equipment and products that follow are worth far more than the structure.

The challenge

A pharmaceutical company is building a sterile fill-finish facility to produce critical medicines.

Commissioning, qualification and validation will take nearly as long as construction, and regulatory inspection dates are fixed. A schedule that treats validation as an afterthought would be wrong from day one.

Schedule at a glance

The whole program, on one line.

Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.

StartJul 2023
Duration36 months
Target finishJul 2026
Progress—
Utilities firstOwn the interfacesCoordinate dailyQualify and validate
How we held the date

Our approach, phase by phase.

The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Utilities first

Utility systems sequenced to be commissioned before tool or process installation begins.

PHASE 02Own the interfaces

Hundreds of contractor interfaces held as dated, owned milestones in one integrated schedule.

PHASE 03Coordinate daily

Look-ahead planning that aligns thousands of daily workers in constrained spaces.

PHASE 04Qualify and validate

Commissioning, qualification and validation built into the schedule from the first baseline.

What changed

The difference we made

Measured the only way that matters: whether the date and the budget held.

Result 01CQV on the same path as construction

Commissioning, qualification and validation sit in the master schedule with real durations, not as a block at the end.

Result 02Inspection-ready by design

Regulatory inspection readiness is held as a hard milestone, with float to it reported every period.

Result 03Patients set the critical path

Supply commitments to patients define what is critical, and the schedule is built backward from them.

Your program, under command

Make your program the next one we land.

Tell us what you are building and the date your board expects. In one senior-led review you will know what it will take to hold it.