RichardBarkleyProject Controls & Capital Advisory
2.0 — WHAT WE DO

6 practices.
49 services.

All practices & services →
2.03 · 7 services

Owner's Advisory & Assurance

Independent senior counsel for owners, boards and investors, from investment decision through recovery and handover.

Open
2.05 · 5 services

Controls Intelligence

Power BI, executive analytics and forecasting that give capital leaders decision-grade foresight.

Open
2.06 · 6 services

The Barkley Institute

Practitioner-taught courses and executive education in P6, scheduling, controls and delay analysis.

Open
Featured practice

Command of the critical path.

1.0 — WHO WE ARE

Independent. Senior. Decisive.

The controls partner owners call when the date cannot move.

Overview
3.0 — MARKETS

Sector fluency. One standard.

We know where each sector hides its schedule risk.

Overview
4.0 — PROJECTS

Representative work. Every client confidential.

60 featured projects across 17 sectors. Every client confidential.

Overview
7.0 — INSIGHTS

Decision-grade thinking.

Field notes, papers and briefings for the people who fund and build.

Overview
9.0 — CAREERS

Do the most consequential work of your career.

For planners, cost engineers and analysts who want their judgment to matter.

Overview
Commercial & Mixed-Use · New ConstructionCompleted 2023

Mixed-Use Landmark Tower

A skyline-changing tower, built on a floor cycle the whole team could feel.

LocationHanoi, Vietnam
ClientConfidential
LocationHanoi, Vietnam
SectorCommercial & Mixed-Use
Value$420M
Size1,937,500 sq ft
DeliveryDesign-Build
Duration40 months
StatusCompleted 2023
Why it mattered

High-rise and mixed-use work runs on rhythm. Hold the floor cycle and the building rises; lose it and every trade behind pays for the slip.

The challenge

A mixed-use tower with offices, residences and retail rose in one of Asia's fastest-growing cities.

The schedule was driven by the floor cycle, and it had to absorb design changes and supply chain delays without losing pace. Each change request carried a time cost that was easy to underestimate.

Schedule at a glance

The whole program, on one line.

Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.

StartMar 2020
Duration40 months
HandoverJul 2023
Progress—
Set the cycleStack the tradesPrice change in timeHand over in sequence
How we held the date

Our approach, phase by phase.

The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Set the cycle

A floor-cycle-driven schedule for structure, facade and services.

PHASE 02Stack the trades

Trade flow planned floor by floor so crews stay productive and out of each other's way.

PHASE 03Price change in time

Design changes assessed for time impact before they are approved.

PHASE 04Hand over in sequence

Residences, offices and retail handed over in a planned order.

What changed

The difference we made

Measured the only way that matters: whether the date and the budget held.

Result 01Rhythm held

The structure kept a steady floor cycle for most of its height, with slips recovered within a cycle or two.

Result 02Change priced in days

Every design change carried a time impact assessment before approval, so the owner chose with the cost in view.

Result 03Handover by sequence

Residences, offices and retail were handed over in their planned order.