RichardBarkleyProject Controls & Capital Advisory
2.0 — WHAT WE DO

6 practices.
49 services.

All practices & services →
2.03 · 7 services

Owner's Advisory & Assurance

Independent senior counsel for owners, boards and investors, from investment decision through recovery and handover.

Open
2.05 · 5 services

Controls Intelligence

Power BI, executive analytics and forecasting that give capital leaders decision-grade foresight.

Open
2.06 · 6 services

The Barkley Institute

Practitioner-taught courses and executive education in P6, scheduling, controls and delay analysis.

Open
Featured practice

Command of the critical path.

1.0 — WHO WE ARE

Independent. Senior. Decisive.

The controls partner owners call when the date cannot move.

Overview
3.0 — MARKETS

Sector fluency. One standard.

We know where each sector hides its schedule risk.

Overview
4.0 — PROJECTS

Representative work. Every client confidential.

60 featured projects across 17 sectors. Every client confidential.

Overview
7.0 — INSIGHTS

Decision-grade thinking.

Field notes, papers and briefings for the people who fund and build.

Overview
9.0 — CAREERS

Do the most consequential work of your career.

For planners, cost engineers and analysts who want their judgment to matter.

Overview
Water & Wastewater · InfrastructureIn progress · 2026

Regional Water System Improvements Program

Nine projects share one pool of funding, one set of outage windows and one community. They have to be run as one.

LocationNew Boston, TX
ClientConfidential
LocationNew Boston, TX
SectorWater & Wastewater
Value$310M
Size9 projects · 1 program
DeliveryProgressive Design-Build
Duration54 months
StatusTarget 2026
Why it mattered

Water infrastructure is invisible until it fails. These programs protect public health for decades and must be built while every tap keeps running, under the scrutiny of ratepayers and funding agencies.

The challenge

A regional water district is modernizing treatment, transmission and storage for the communities it serves, through a multi-year program of nine projects.

The projects share funding sources, contractors and outage windows. When we were engaged, each was scheduled on its own, so a delay on one could quietly consume another's outage window or funding draw without anyone seeing it happen.

Schedule at a glance

The whole program, on one line.

Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.

StartJan 2022
Duration54 months
Target finishJul 2026
Progress—
Structure the programMatch cash to fundingPlan the live tie-insKeep a defensible record
How we held the date

Our approach, phase by phase.

The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Structure the program

Projects, funding sources, permits and outage windows integrated into one master schedule.

PHASE 02Match cash to funding

Cost forecasts aligned to state and federal draws and board approval cycles, so committed money keeps working.

PHASE 03Plan the live tie-ins

Bypasses and service outages placed in low-demand seasons, each with a tested contingency.

PHASE 04Keep a defensible record

Contemporaneous schedule records maintained to withstand any audit, review or claim.

What changed

The difference we made

Measured the only way that matters: whether the date and the budget held.

Result 01One program schedule

All nine projects and their shared constraints sit in a single master, so knock-on effects appear in the period they occur.

Result 02Cash matched to funding

Cost forecasts are aligned to state and federal draw schedules, keeping committed funds working rather than idle.

Result 03Outages planned program-wide

Service outages are coordinated across every project to protect customers and avoid stacking.