RichardBarkleyProject Controls & Capital Advisory
2.0 — WHAT WE DO

6 practices.
49 services.

All practices & services →
2.03 · 7 services

Owner's Advisory & Assurance

Independent senior counsel for owners, boards and investors, from investment decision through recovery and handover.

Open
2.05 · 5 services

Controls Intelligence

Power BI, executive analytics and forecasting that give capital leaders decision-grade foresight.

Open
2.06 · 6 services

The Barkley Institute

Practitioner-taught courses and executive education in P6, scheduling, controls and delay analysis.

Open
Featured practice

Command of the critical path.

1.0 — WHO WE ARE

Independent. Senior. Decisive.

The controls partner owners call when the date cannot move.

Overview
3.0 — MARKETS

Sector fluency. One standard.

We know where each sector hides its schedule risk.

Overview
4.0 — PROJECTS

Representative work. Every client confidential.

60 featured projects across 17 sectors. Every client confidential.

Overview
7.0 — INSIGHTS

Decision-grade thinking.

Field notes, papers and briefings for the people who fund and build.

Overview
9.0 — CAREERS

Do the most consequential work of your career.

For planners, cost engineers and analysts who want their judgment to matter.

Overview
Aviation · ExpansionIn progress · 2026

International Airport Terminal Expansion

A new terminal rising beside the old one, with every flight still leaving on time.

LocationDes Moines, IA
ClientConfidential
LocationDes Moines, IA
SectorAviation
Value$380M
Size265,000 sq ft
DeliveryCM at Risk
Duration42 months
StatusTarget 2026
Why it mattered

Airports do not close. Every phase must keep passengers moving, airlines flying and security working, while new capacity rises beside them.

The challenge

A growing airport is building a new terminal with additional gates, security checkpoints and concessions, while the existing terminal stays fully operational.

Airside work, security requirements and airline gate commitments make phasing as critical as construction. A phase that runs long can strand a gate an airline has already scheduled.

Schedule at a glance

The whole program, on one line.

Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's data date.

StartJan 2023
Duration42 months
Target finishJul 2026
Progress—
Phase around operationsAlign every partyIntegrate the systemsSchedule readiness
How we held the date

Our approach, phase by phase.

The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Phase around operations

Gates, checkpoints and roadways phased so the airport keeps running at every stage.

PHASE 02Align every party

Airlines, security agencies, concessionaires and the airport working from one master schedule.

PHASE 03Integrate the systems

Baggage, security and IT testing planned months ahead of opening.

PHASE 04Schedule readiness

Training, operational trials and transfer to operations planned to the day.

What changed

The difference we made

Measured the only way that matters: whether the date and the budget held.

Result 01Gates kept in service

Phasing keeps the required gates and checkpoints open through every stage of the work.

Result 02Many parties, one schedule

Airlines, security and concessionaires plan their own moves against the same master schedule.

Result 03Readiness scheduled, not hoped for

Operational trials, staff training and transfer to the airport are planned activity by activity.

Your program, under command

Make your program the next one we land.

Tell us what you are building and the date your board expects. In one senior-led review you will know what it will take to hold it.